What is GreenWall?

GREENWALL is a new-generation composite wall with superior specifications surpassing the conventional CHB system.

It is the only ‘Non Load Bearing Block’ in its category with the most features. GREENWALL is a patent pending and registered product.

Installed GREENWALL blocks are finished and paint-ready.

Composition of GreenWall?

GREENWALL is using natural materials that are locally available.

Cross section

HEAT INSULATED

HEAT INSULATED

The sanfwiched expanded polystyrene (EPS) provides Class A heat insulation, thus eliminating the need for sheating.

SOUND INSULATED

SOUND INSULATED

It provides sound insulation and acoustic comfort.

MINIMAL PLASTERING

MINIMAL PLASTERING

Thanks to its smooth flat surface and channeled design, bonding is error-free and plastering minimal.

ECONOMICAL

ECONOMICAL

Significantly reduced installation time (see Table).

FIRE RATED

FIRE RATED

Exceeds the industry standard 2-hour fire rating.

LIGHTWEIGHT

LIGHTWEIGHT

64% lighter than CHB (see Table).

EXTRA LIVING SPACE

EXTRA LIVING SPACE

CHB walls typically require a 25mm plaster finish per side. Not the case with GreenWall.

EASE IN INSTALLATION

EASE IN INSTALLATION

Opening channels, junctions, drilling, and cutting works is easy for electrical, mechanical, and other utility piping.

GW10

interior/exterior walls
  • Size 60x30 cm
  • Thickness 10 cm
  • Weight 17 kg
  • Fire Rating > 2 hours
  • Sound Insulation -50 dB
  • Thermal Insulation R = 2.306m
  • Kg/sqm +- 95 kg
  • Construction Time 50 sqm 2 days
  • Use of Reinforcement H&V 90 cm
  • 4-way interlocking system
  • Up to 85% Time Savings
  • Up to 64% Weight Savings
  • Up to 50% Energy Savings

GW15

exterior walls
  • Size 60x30 cm
  • Thickness 15 cm
  • Weight 23 kg
  • Fire Rating > 2 hours
  • Sound Insulation -50 dB
  • Thermal Insulation R = 2.306m
  • Kg/sqm +- 125 kg
  • Construction Time 50 sqm 2 days
  • Use of Reinforcement H&V 90 cm
  • 4-way interlocking system
  • Up to 85% Time Savings
  • Up to 64% Weight Savings
  • Up to 50% Energy Savings
Popular

Contact details

4th Floor PIA Center
65 East Capitol Drive
Kapitolyo, Pasig City